Laserfiche WebLink
QL'nRTERLY PO\'D I\SPECTIO\ REPORT <br />• - s <br />OPERATOR: Snowmass Coal Company <br />MINE: North Thompson Creek Mines <br />DATE OF INSPECTION: April 2, 1985 <br />1 2 3 4 5 <br />POND IDENTIFICATION <br />• TYPE OF POND <br />P-1 P-3 P-4 P-5 P-6 <br />Detention Detention Detention Detention Detention <br />L <br />OPERATIONAL STATUS AT TIME OF INSPECTION <br />Approximate water level: DrY, } Capacity, Capacity, Dry, Dry <br />Sediment level(% total storage): 10%, 50%, 50%, 10%, 10% <br />outflow(cfs): No, No, No, No, No <br />FEATURES <br />U <br /> <br />PRORLE'~f. <br />COMMENTS <br />EROSIONAL: 'E NO <br />Rills b Gullies on Embankment x <br />Inadequate Vegetation x <br />Outlet Channel Erosion x ~ <br />Burrows x <br />Other x <br />STRUCTURAL: 'E NO <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other x <br />PURTENANT STRUCTURES: ES NO <br />Defective Spillways x <br />Dewatering Device Clogged x <br />Faulty Gates, Baffles, Pumps x <br />Other x Pond P-3 <br />DITIONAL COMMENTS: f <br />IrTENANCE REQUIRED:' Ponds P-3 and P-4 will be cleaned this spring. <br />The emergency spillway from Pin d P-3 to P-4 is in need of repair. It is still <br />able to function properly. Maintenance will be performed on it this spring. <br />NAME OF INSPECTOR: Scott Jones <br />RL/82 <br />