My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64927
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:50 PM
Creation date
11/20/2007 8:37:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
1/21/2005
Doc Name
1st - Adequacy Review Comments
From
DMG
To
Banks and Gesso LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecstate.co.us <br />R€CEf V E® <br />pF'CO~ ' <br />y` <br />~~ <br />~ ~ <br />~ ~ <br />~ /896 ~ <br />NOV 162004 <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: November 16, 2004 <br />TO: Thomas A. Schreiner, Environmental Protection Specialist <br />CC: Division 1 Office, District 7 Water Commissioner <br />FROM: loans Comaniciu, E.LT. <br />RE: MMRR Quarry, File No. M-2004-067 <br />Operator: Clear Creek District Water Providers, LLC-303-773-1005 <br />Contact: Banks and Gesso, LLC-Paul Gesso-303-274-4277 <br />Section 26, Twp 3 South, Rng 72 West, 6th P.M., Gilpin County <br />CONDITIONS FOR APPROVAL <br />Bill Owens <br />Governor <br />Russell George <br />EzecuUve Director <br />Hal D. Simpson, P.E. <br />Sia[e Engineer <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. However, this project will affect two unnamed <br />drainageways (surface water) located in the quarry area and that will flow only as a result of rainfall or <br />snowmelt. The applicant must show that no injury to other vested water rights will occur as a result of <br />this quarry project. <br />^ The proposed operation will consume ground water by: ^evaporation, ^ dust control, ^reclamation, <br />^watt;r removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for 'such industrial use. Applicant should contact the <br />water commissioner.forfurthar information. <br />® The applicant has identified that the only water requirement for this project will be for dust control. All <br />water will be trucked into the site. If waterwill be used for any other purpose at this site, the applicant will <br />need to document that the water was obtained from a legal source, or the water was diverted in priority <br />under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.