My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64927
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:50 PM
Creation date
11/20/2007 8:37:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
1/21/2005
Doc Name
1st - Adequacy Review Comments
From
DMG
To
Banks and Gesso LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' .. ) ,i <br />State Highway Actess'Permit ,Page 3 <br />Attachment.to Permit No.:103039 -Additional Terms and Coriditions. <br />,, <br />`Bid Plans Room.:. , : <br />4201 EasbArkansas Avenue. <br />Denver, CO: 80222 3406 <br />All matenals; equipment, installahon,'construction, and design, including auxiliary lane. (s)and the ; , <br />intersection improveinerits within state highway right-of--way, shall be in accordance with the applicable <br />CDOT.and local jurisdictions standards <br />,..: <br />1 Z. All work is to conform 1o.the plaris referenced by this permit on file with the Department or as modified by <br />.. . <br />this pemiif: (If discrepancies arise; this permit shall take precedence over.the plans:) The Department or .. <br />issuing authority plan review is orily.for general wnformance with the Departmetit's. design and code . <br />'requirements.:-The Depaitnient or issuing authority is not responsible forthe accuracy and adequacy of the <br />- design; dimensions, eleyafions and other elements which.sfiall.he coiifirnied and correlated at the work site. <br />The Department, through the approval of this document, assumes no responsibility.for the completeness or , <br />accuracy of the plans - . . <br />.. <br />18.. . Survey markers.or monuments must be preserved in their original positions; Notifythe Department at . ' <br />_ , 303,757-9744 immediately upon damage to or discovery of any such markers or monuments at the work site. <br />Any survey markers or monuments disturbed during execution of this permit shall be repaired and/or replaced <br />immediately at the expense of the Permittee. <br />19. Construction Plans must be approved by the Colorado Department of Transportation; Region One, prior to the <br />``issuance of the Notice to Proceed: <br />20. Signing and Striping Plans must be approved by the Colorado Department of Transportation, Region One, . <br />'prior to the issuance.of the. Notice to Proceed. <br />21. Traffic ConttolPlans must be approved by the Colorado.Department of Transportation, Region One, prior to <br />-the issuance ofthe Notice to Proceed. <br />22. Upon completion of the work, "the Permittee/Contractor/Engineer shall submit an "As Built" plan, showing in <br />detail all construoiton changes, modifications and revisions.. All changes; modifications'andrevrsions. shall be <br />Sealed and signed by a Colorado Registered Professional.Engineer. , . <br />23. .Upon completion of the.work, a letter cerhfymg that all project materials, construction, inspection and' <br />workmanship was in accordance with the plans and applicable Department standards and specifications for . <br />road and bridge constmcfiosshall be'submitted to the Colorado Department of Transportation, Region One, <br />Traffic Section, 18500 East Colfax Ave.; Aurora; CO. 80011...The certification letter must be sealed and <br />. signed by a Colorado registered professional engineer. <br />24. `The Pemuttee must have available for review. at the'rime of conditional acceptance, all documentsrelating to <br />construction (ie: plans;.project correspondence; materials testing and survey notes). <br />25: hi accordance with Section 2 5 (~ of the State Highway,Access Code, final acceptance of the access <br />improvements by CDOT, Region One; will be provided to the Permittee in, writing two (2).years from the date <br />of construction completion:.:If you have not ieceived:a P.nal acceptance Ietter in two years, please contact the <br />`Fcegien One Access Manager at 303-757-9123;' <br />26. It shall be thz responsrbilityofttie Pemutee:to verify the location of the existing utilifies and notify.all utility, <br />owners or operators of any work that might involve utilities within the State Highway riglit-of--way. -Any work <br />necessary to protect existing permitted utilities; such as an encasement will be the responsibility of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.