My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64927
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:50 PM
Creation date
11/20/2007 8:37:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
1/21/2005
Doc Name
1st - Adequacy Review Comments
From
DMG
To
Banks and Gesso LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} .::.: i <br />State Highway Access Permit - Pace 1 <br />Attachmenf #o Kermit No. 103039 =Additional Terms and' Conditions :. . <br />1. A Notice to,Proceed, COOT Form 12b5, is required before beginning construction of the access or any activity <br />in~CDOT Right-of-Way, :All submittals, documents; plans and other items that must be completed, hall be ...' <br />submitted aiid `approved before a Notice to Proceed for constructor will be issued. Contact the Department : . <br />for the Notice to Proceed : '. <br />`2. If ther@ are any guesfions regazding this pertnit, please contact Chuck Binford, COOT Access Manager, of , <br />303-757 9123: .. - <br />;..: , <br />3: Inctlrpoiated as part of this permit: will be the followmg ,'.; .. <br />,. <br />Applicauon forAccess Perriut (COOT Form No. 137) <br />', The Peinrit (COOT Foim 101) and its two page attaohment `(COOT Form 101B) ..: <br />N.oticeao Proceed, ; . ':' . <br />Construction Plazas ~ , <br />Signing and Striping Plans _ <br />Certificate of Insurance (To be submitted to COOT prior to beginning construction in COOT Right-of--Way) . <br />.... <br />4. If riecessazy, minor changes, corrections, and/or additions. to this peanut may be ordered by the Department <br />inspector;'other Department repi•esentives or local authority.tn meet unantioipatedsite condifions. Changes <br />may not be iri. violation of the Code: : - . <br />5. Left tum movements iri and.out of this access may be prohibited of some' future date: . <br />_. <br />6. This access shall,be used only for commercial purposes with thewehicular volume using.tlie access during the <br />Peak Hour not to exceed' 15 vehicles per hour.: ' <br />. 7. This access permit is not valid unless the proposed use is approved by Gilpin County. <br />8. The Permittee is.responsihle:for obfaining any necessaryadditional federal; state, and/or city/countypemiits or <br />cleazances required for construction of the access. Approval of.this Access Permit does not constitute <br />verification of this action by the Permittee. - <br />9. The Permittee shall provide the Department and /or the issuing adthority with the following information prior . <br />to commencement of any oonstruction activities beyond the existing curb and gutter or paved azea, within <br />. <br />COOT Right-of--Way: <br />A.: Written clearances for Threatened or Endangered Species. <br />.. B. Wetlands elearanoeS., . <br />'C. Archaeological.andPaleontological clearances. Any discoveries shall be mitigated in conformance with <br />section 107.23 of the standazd specifications for road acid bridge construction; latest.edition. Asurface survey <br />mnst.be performed and a written clearance provided to the Department: and/or issuing authority prior to' . <br />commencement of any cbnstmchon.: " <br />It is the responsibility of the Permittee to assure that no such sites are present prior to commencement of <br />.. <br />constmction activities. 1111 identified sites. shall be mitigated to the satisfaction of the appropriate agency prior <br />- to proceeding with work activities... `" <br />Wetland mitigation shall be completed in bonformance with the policies, procedures and regulations of the . <br />' Army Corps of Engineers, Federal Highway Administration and the State of Colorado, as maybe applicable. . <br />10. All costs associated wmththe installation of this access are the responsibility of the Permittee. 'This includes <br />the design, constnrction, utility relocations, testing of materials, ahd inspections. <br />. 11. . -Any work within: CDOTRight-of-Way shall•begin after 8:30 am and all work and equipment shall be off the <br />
The URL can be used to link to this page
Your browser does not support the video tag.