My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64927
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:50 PM
Creation date
11/20/2007 8:37:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
1/21/2005
Doc Name
1st - Adequacy Review Comments
From
DMG
To
Banks and Gesso LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revisions -Exhibit C-2A ConstrucHon of Main Access Road -Please revise Exhibit C-2A to include <br />the following: <br />engineering designs & details for the culvert installation/drainage crossing at the lower end of <br />main access road (culvert size & flow capacity, % grade, #ft of compacted fill above, outlet <br />controls, etc.) <br />engineering designs & details for conveyance of road drainage to Sediment Pond A <br />acceptable grade control methods for road drainage (straw bales aze not acceptable) <br />Revisions -Exhibit C-2C Mining Plan Map -Please revise Exhibit C-2C to include the following: <br />engineering designs & plans, including slope configuration(s), for each runoff diversion channel <br />engineering designs & plans, including spillway configuration/method, for each sediment pond <br />width, depth, & slope(s) chazacterizarion of natural drainages to be reproduced via diversion <br />channels (recommended-not required) <br />Revisions -Critical Cross Sections 10-Year Plan -Please revise the Critical Cross Sections 10-Yeaz <br />Plan Map to include details for cross sections A-A', B-B', C-C', D-D', & E-E'. <br />Revisions -Critical Cross Sections Processing/Plant Area -Please revise the Critical Cross Sections <br />Processing/Plant Area Map to include the following: <br />details for cross sections A-A', B-B', C-C', D-D' <br />clarify the location and orientation of the processing plant area typical cross section <br />orientation for construction of the waste rock pile, ie: downstream to upstream, other? <br />plans & designs for the internal haul road to the temporary waste rock storage area, is this <br />a temporary road to be reclaimed during fmal reclamation? <br />6.4.4 EXHIBIT D - Minine Plan <br />Maximum Disturbance -The applicant has specified that the mine plan encompasses only 27.71 of the <br />entire 526.70 acres to be permitted. The mine plan also specifies the following disturbances: a) main <br />access road, b) processing/loadout site, c) waste rock storage pile, d) quarry extraction azea, and e) <br />- inciden4aTdisfurbarices.--In conformance wry Ames 6A~(d~and-6.-4~(eJ(ii), please clarify tha maximum <br />disturbance to be expected at any one time throughout the life of the operation. Please be sure to describe <br />the maximum quarry disturbance in terms of the vertical and horizontal extent of un-reclaimed highwalls <br />and their configuration as well as the volume of shot rock at the foot of highwalls and the "footprint" of the <br />entire quarry disturbance. Please respond. <br />Overburden -The applicant specifies on page 8 that excess cut material from main access road <br />construction will be placed in a temporary waste rock storage azea, and on page 9 that up to 90,000 cubic <br />yazds of unusable overburden maybe generated during construction of the 4 acre processing/loadout site. <br />In conformance with Rule 6.4.4(f), please clarify the maximum volume and location of un-reclaimed <br />overburden or waste rock to be expected at any one time throughout the life of the operation. This estimate <br />should address the estimated volume of waste rock or overburden from the main access road construction <br />and/or from quarrying operations at the toe of the quarry highwalls. Please respond. <br />Process Files - In conformance with Rule 6.4.4(f), please verify the maximum expected volume of process <br />fines to be generated and stockpiled on site at any time throughout the life of the operation. Please <br />
The URL can be used to link to this page
Your browser does not support the video tag.