Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 098 State :Colorado <br />Date :06/21/2006 County :Mesa <br />User : SSS Site :20 Road Gravel Pit <br />sheet 1 of 2 <br />Permif or otherjob action :New 1 i2C Application <br />Task description :Transport reclamation equipment fO/frOm sif¢ <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2005) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities . 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $25.36 $28.12 $34,53 <br /> Operating cost/hour : $36.15 $37.62 $41.10 <br /> Operator cosUhour : $27.40 $27.40 $27.40 <br /> Helper cosUhour : $0.00 $25.15 $25.15 <br /> Total Unit Cost/hour : $88.91 $118.29 $128.18 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CostJhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet <br />-Cat D8R Series II - 8SU 52.55 $53.92 $128.18 1 $182.10 <br />-Cat 633E Series 2 (2001) 56.34 $65.49 $128.18 1 $193.67 <br />-Centrifugal pump, CPB No. 2.17 $11.63 $88.91 1 $100.54 <br />-Revegetation equip 20.00 $20.00 $88.91 2 $217.82 <br />PermiUjob # : M-2005-061 <br />Abbreviation :none <br />Filename : MO61.09a <br />Return Trip DOT permit <br />CosUhr/fleet Costlfleet <br />$128.18 $0.00 <br />$128.18 $0.00 <br />$88.91 $0.00 <br />$177.82 $0.00 <br />Subtotals: $694,13 ~ $523.09 ~ $0.00 <br />