Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 06a <br />Date : 06/21/2006 <br />User: SSS <br />State :Colorado <br />County :Mesa <br />Site :20 Road Gravel Pit <br />Agency or organization name : DMG <br />Permit or other job action :New 112c <br />Task description :Rep/a CE <br />HOURLY EQUIPMENT COST <br />6 inches of topsoil over 13.7 acre affected area <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $53.92 NA <br /> Operating cost/hour : $75.29 100 <br /> Ripper op, cosUhour : $0.80 10 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cost/hour : $162.54 Total fleet cosUhour : $162.54 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 11,051 LCY factor : NA volume: 11,051 LCY <br /> <br />Source of estimated volume :Affected area minus topsoil stockpile and lake area <br />Source of estimafed swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 726.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.70 (fnd-mn <br /> Push gradient : 1.14 (Cal HB) <br />Average push gradient : 6.00 % (neg) Altitude : 1.00 (Cat Hf3)_ <br />Average site altitude : 4,500 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.71 <br />Weight description <br />Top Soil Adjusted unit production : 517.51 LCY/hr <br /> Adjusted fleet production : 517.51 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 21.35 Hours <br />Unit cost : $0.314 /LCY Total job cost : $3,471 <br /> <br />Permit/job# : M-2005-061 <br />Abbreviation :none <br />Filename : MO61-O6a <br />Horsepower: 310 <br />