My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27913
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:15 PM
Creation date
11/20/2007 8:37:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Hydrology
Doc Date
11/6/1992
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM COG-850014 SLURCO CORP
From
CDOH
To
SLURCO CORP
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 6 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations (continued) <br />d) Burden of Proof Requirement <br />The permittee has the burden of proof when requesting relief from <br />total suspended solids (TSS), total iron and/or settleable solids <br />limitations. Relief shall be granted only when necessary and shall <br />not be granted when the permittee has control over the discharge. <br />The permittee should endeavor to meet the primary limitations <br />whenever possible. <br />1) For rainfall. to waive TSS and total iron limitations, it is <br />necessary co prove that discharge occurred within 48 hours after <br />measurable precipitation has stopped. In addition, co waive <br />settleable solids limitations, it is necessary to prove that <br />discharge occurred within 48 hours after precipitation greater <br />than the 10-year, 24-hour event has stopped. <br />2) Far snowmelt. to waive TSS and total iron ].imitations, it is <br />necessary to prove that discharge occurred within 48 hours after <br />pond inflow has stopped. In addition, to waive settleable <br />solids limitations, it is necessary co prove that discharge <br />occurred within 48 hcurs after pond inflow volume greater than <br />the IO-year, 24-hour event has stopped. <br />The Division shall determine the adequacy of proof. As part of <br />this decermiration, the Division shall evaluate whether the <br />permittee could have controlled the discharge in such a manner that <br />primary limitations could have been met. A11 manual dewatering <br />must meet TSS and total iron limitations. <br />2. Stormwater Management Plan <br />The permittee shall prepare and submit two copies of a Stormwater <br />Management Plan (SWMP) to the Water Quality Control Division. The <br />plan shall be submitted within six months from the date that <br />certification under this permit was granted to the facility. An <br />additional copy of the plan shall be submitted to: <br />Colorado Department of Natural Resources <br />Mined Land Reclamation Division - Coal Mining Section <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />The Division will review and approve each plan. Upon approval, the <br />plan shall be incorporated into the permictee's certification 6~r <br />reference. Failure to implement the approved plan as described shall <br />be a violation of the permit. The plan shall remain in effect as long <br />as the facility is regulated by a CDPS permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.