Laserfiche WebLink
ENE <br />DISI <br />0 <br />ro <br />ro <br />\/ <br />• 0s \0 <br />POST CONSTRUCTION CONTOURS <br />PRECONSTRUCTION CONTOURS IN <br />CONSTRUCTION AREA <br />e . EDGE OF FILL <br />v <br />SECTION AA <br />—6210 <br />I 10 I <br />PRIMARY SPILLWAY <br />EMERGENCY �7 A _ <br />SPILLWAY <br />—6200 SEDIMENT! <br />3 STOACE <br />J I <br />—6190 2 <br />ORIGINAL <br />GRADE <br />—6180 ,Z —VERTICAL I" = 10' <br />HORIZONTAL 111 = 2d <br />/ KEYWAY <br />6160 <br />ENERGY <br />DISSIPATOR <br />—6150 <br />NOTE: USE STANDARD DEWATERING DEVICE <br />AS PRIMARY SPILLWAY <br />620 <br />SECTION BB <br />RIP RAP <br />I L— F' 11 .5' <br />2 2 <br />5 <br />SCALE I'l = 51 <br />ELEVATION VS. CAPACITY <br />'OP OF DAM <br />6195 0.45 A.F \ I /.19 A� <br />IO I 0.2 0.44 0.6 0.8 1.0 <br />STORAGE VOLUME (acre ft.) <br />REQUIRED ACTUAL <br />SEDIMENT STORAGE 0.25 0.45 <br />WATER STORAGE 0.15 0.19 <br />TOTAL 0.40 0.64 <br />.A <br />CONSTRUCTION COMPLETE <br />ON SEPT. 1979 AS PER <br />THIS DES.IG N. <br />DESIGN APPROVED - BY-.Yi-3a <br />0 G� SEPT. 1979 <br />RIEC'M. 4zml, <br />AUG 21 1966 <br />MINER LAND MLAMATION <br />Colo. Dept. of Natural Resources <br />ureU. ly�-Gi•a <br />EMPIRE ENERGY CORPORATION FtGY CC,QA <br />POND 9A— P4 W z <br />� o <br />0 <br />JOB NO. DRAWING NUMBER OnrE _ �94/G COLO�PO <br />SCALE <br />DATE NO. REVISIONS .DATE <br />DRAWN D.L.B. 10 -8 -79 <br />TRACED <br />CHECKED <br />APPROVED <br />0061 <br />