Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />QUARTERLY POND INSPECTION REPORT <br />PERATOR: HONEYWOOD COAL CO. QUARTER: FIRST QUARTER 1993 <br />INE: HAMILTON MINE DATE OF INSPECTION: MARCH 5, 1993 <br />POND IDENTIFICATION A B <br />YPE OF POND SEDIMENT SEDIMENT <br />TATUS DURING INSPECTION: <br />PPROXIMATE WATER LEVEL DRY 12" <br />SED ($ total storage) 0$ 0$ <br />UTFLOW (cfs) 0 0 <br />FEATURES PROBLEM COMMENTS <br />ROSIONAL: YES NO <br /> <br />Rills & Gullet's X <br />Inadequate Vegetation X See below <br />Outlet Channel Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />PPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. X <br />Other X <br />DDITIONAL COMMENTS: Ponds were built during the first quarter of 1992. <br />Seeding of the pond embankment will occur during the spring of 1993. <br />INTENANCE REQUIRED: None <br />AME OF INSPECTOR: Kirwkes 3,,ct_g3 <br />James E. Stover <br />Colorado P.E. 19230 <br />