My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27891
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:14 PM
Creation date
11/20/2007 8:36:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
5/12/2006
Doc Name
2nd Quarter 2006 Sediment Pond Inspection Report
From
Western Fuels-Colorado, LLC
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION BORM <br />iVATER, SEDIMENT, OR SLIIRRY INPOIINDMENTS <br />Inspectors Name; l~oesa ~ab~ Date:_ D5-o8-0~. <br />NPDES ID. No.:C~-0000213 Date Last Inspected: 03_ -ds._o(e <br />Facility Configuration: Total Incised Pond . <br />Site Name: Impoundment #0014 Location:47N16W SEC 31 <br />Mine Name: New Horizon Mine Location:l mi.NW_of Nucla, CO. <br />Mine ID No.: CDMG Permit #0008-81 <br />Owners Rep.: R. L. Wade Mine Mana4er <br /> CIRCLE OR WRITE IN APPROPRIATE RESPONSE <br />1• Foundation Preparation (removal of vegetation, stumps., topsoil) Ye No N/A <br />z• Lift thickness (inches) ~'Z ~ ~,Q <br />3• Compaction according to approved plan yBy No N/A <br />4• <br />5 Burying (specify a-xtend and location) Yea No N/A <br />. Angle of slope: 3:1 upstream, 3:1 downstream <br />6• Seepage (specify location, color, and approx. volume) <br /> a.) From underdrain pipes: Yes ~ N/A <br /> b-) At isolated points on emban)oneat slopes: Yes ~ N/A <br /> cl At natural hillside: yes ® N/A <br /> d) Over widespread areas Yes Q) N/A <br />. e) Prom downsteam foundation area Yes ® N/A <br /> f) 'Boils" beneath strain or ponded water Yes ® N/A <br />Y-- Cracks or scarps oa crest Yes N9 N/A <br />S• Cracks or scraps on slope Yes ® _ <br />N/A <br />9. Sloughing or bulging on slope yea ® N/A <br />10. Major erosion problems Yes ~~ N/A <br />11. Surface movements is valley bottom or on hillside <br />Yes ®) N/A <br />12. Erosion of tce Yes ® N/A <br />13. <br />14 Nater impounded against tce <br />E <br />i <br />i Yes ' 4~ N/A <br />. x <br />st <br />ng embankment .freeboard (feet) <br /> <br />35. <br />Cracks, bulging, or erosion on upsteam face ~ <br />yes _ <br />~ Feet <br />N/A <br />16. Visible sumps or sinkholes in slurry surface Yes ~ N/A <br />17. Clogging <br /> a) Spillway channels and pipes Yes No ]~ <br /> b) Decant system Yes No N/ <br /> c) Diversion Ditches Yes No N~. <br />18. Cracking or crushing of pipes <br /> a) Spillway pipes <br />Yes <br />No <br /> b) Decant system Yes No N® <br />19. Trash racks clear and in place Yes No <br />P~µ~ \s pig <br />F:\Eng\DATA\WP\ppnd-banks\DAMFOEM.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.