Laserfiche WebLink
• EXHIBIT 4 <br />RECLAAAATION ACTIVITIES <br /> Activity Duration <br /> Final CMLRD Aprpoval -- <br /> Select Contractor 4 <br /> Field Surveying 1 <br /> Construction Mobilization 2 <br /> Construct Parking and Turn Around Area I4 <br /> Haul Loadout Area Base Coal to Pit 1 <br /> Remove Structures 2 <br /> Backfill Pit 7 <br /> Cut Drainage Corridor 1 <br /> Construct Sediment Pond 2 <br /> Place Topsoil 2 <br /> Seed and Mulch 2 <br />• <br />• <br /> 116E (Revised 04/13/90) <br />