My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64829
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:43 PM
Creation date
11/20/2007 8:34:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001018
IBM Index Class Name
Permit File
Doc Date
3/14/2001
Doc Name
CONSTRUCTION MATERIALS LIMITED IMPACT 110 OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT D: RECLAMATION PLAN <br />1.) <br />a.) The topsoil of 6" will be salvaged for use only in reclamation. The topsoil will be <br />timely replaced as mining continues. It is anticipated that stockpiled topsoil will <br />cover all exposed slopes after mining. <br />b.) The reclaimed slopes will be placed to a minimum of 3:1. <br />c.) The salvaged topsoil will be replaced at 6" depth. The seeding will be done upon <br />completion of excavation. Site will be chiseled and disked after topsoil placement <br />and prior to seeding. Seed will be drilled. The seeded land will be mulched as <br />needed. There will be no trees or shrubs planted on this land. The grass mix and <br />seeding rate will be recommended by Logan County NRD and is enclosed in pages <br />following this exhibit. Fertilizer will be used if soil conditions warrant the use. Seed <br />will be drilled. <br />d.) All access roads will be reclaimed in the same manner as the mineral land. There <br />will be no structures remaining on the permit site. <br />e.) The area where topsoil was stockpiled will be chiseled and reseeded. <br />f.) Equipment cost for reclamation /custom operation rates /grading /backfilling / <br />spreading topsoil: <br />1500 cu yards@ 1.50/ cu yd = <br />Chisel site- 10 acres @15.00 = <br />Disc site-10 acres @ 15.00 = <br />Drill site- 10 acres@ 15.00 = <br />Grass seed-460 Lbs @ 2.00 = <br />Mulch - 10 acres @ 20.00 = <br />$2250.00 <br />$150.00 <br />$150.00 <br />$150.00 <br />$920.00 <br />$200.00 <br />$3820.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.