My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64817
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:42 PM
Creation date
11/20/2007 8:34:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200722308
IBM Index Class Name
Permit File
Doc Date
5/9/2007
Doc Name
NOI Application
From
Oxbow Mining LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hotchkiss Ranches <br />P. 0. Box 479 <br />Hotchkiss, CO 81419 <br />July 07, 2005 <br />Mr. Jim Cooper <br />Oxbow Mining, LLC <br />P.O. Box 535 <br />Somerset, CO 81434 <br />Dear Mr. Cooper: <br />This letter is to confirm Hotchkiss Ranches' understanding of Oxbow Mining's <br />plans to conduct coal exploration drilling and/or mine vent borehole drilling <br />projects at least in part on Hotchkiss Ranches' property in upper Bear Creek. <br />These projects will typically be conducted during the summer months and the <br />projects will include construction (or reconstruction) of access to and pads for the <br />drilling operations. Some sites on BLM and/or US Forest Service lands may also <br />be accessed through Hotchkiss Ranches' property. Site-specific drilling and <br />access plans will be reviewed with Hotchkiss Ranches at least two months prior <br />to the beginning of each year's drilling project. <br />Oxbow Mining will start coal exploration drilling each year as soon as suitable <br />ground conditions exist, but would typically begin in June. If need be to <br />accommodate Hotchkiss Ranches hunting business, Oxbow Mining will complete <br />its drilling operations on Hotchkiss Ranches property by the middle of August <br />each year. <br />Oxbow Mining plans to minimize drill site preparation work and will reclaim the <br />sites to at feast as good a condition as before drilling. At completion of drilling, all <br />existing roads used during the project will be final graded. Hotchkiss Ranches <br />requests that any new roads constructed on its or Oxbow's property leased by <br />Hotchkiss Ranches be left in place for its grazing or other future access. <br />Sincerely, <br />Hotchkiss Ranches, Inc. <br /> <br />Brian "Kip" Farmer, <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.