Laserfiche WebLink
GB-2 <br />UNIT TRAIN LOADOUT GROUND WATER <br />SITE UTL-01 UTL-02 UTL-03 UTL-04 <br />3/27/2001 10.58 9.50 8.25 4.18 <br />6/20/2001 11.48 8.60 8.43 4.52 <br />8/29/2001 11.65 9.14 8.97 4.54 <br />11/8/2001 11.08 9.54 8.94 4.40 <br />1 /3/2002 <br />