Laserfiche WebLink
<br />III IIIIIIIIIIIIIIII BASIN RESOU[tCEB, INC. <br />SEDIMENTATIpN POND IN$P£CT10N FORM <br />Pond- /~ ~ P Z r'y NQ' S NPDES No. ~~ o ~C9~ ~~$'~ <br />Date of Inspection- ~-// S~ ~ S `{ <br />EMB <br />1. ANK!lLNT <br />Adequacy of the vegetative cover: al , Noderata, <br />Pew, <br />Poor <br />2. Erosion forming gullies: Extensive, 8os:e, Very Paw, 11oni <br />3. Is wave action causing erosion: _. <br /> On the upstream embankment? Xea ho J <br /> At the principal spillway inlet? Yes lfo_~ <br /> <br />4. Erosion of the downstream tea o! the embankment? Yea No <br />'p <br /> The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? Yee No ~It yes <br />could this aeepege cause potentisl instability? Yes llo <br />Explain• <br />PRINCIPAL BPILLMAY <br />1. Is the principal spillway system in working order? Yee "~~llo <br />2. ie the inlet free of debris and restrictive material7Yes / If~o <br />3. Is the discharge outlet tree of restrictive material? Yes?/ No_ <br />4. is erosion occurring at the discharge outlet? Yee„`No ~ It <br />yea, <br />evaluate the severity: Extensive ltodernta Just: starting Rone <br />URGENCY BPILI~/-Y <br />1. Is the overall emergency epillw 7~eyatem capable of passing <br />design storm discharge? Yes /No <br />2. Does it appear ae if the emergency'spillwa has d:Lscharged water <br />since the last inspection? Yes No~ <br />3. Is erosion occur q at any section of the emergency spillway? <br />Yes No Describe the <br />extent <br />SLDINENT STORAGE CAPA{;ITY <br />1. Hae the design ~t~orage capacity of the reservoir been surpassed? <br />Yea No / If yes, <br />explain• <br />Please add any special comments concerning potent n are e <br />problems on the beck of this sheet. <br />IriWpsctor~~~~ <br />