My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64728
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:38 PM
Creation date
11/20/2007 8:31:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 4 PERMITS FOR MINING
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TO: BOCC <br />FROl~i: Planning Commission (staff Steven Weatbay) <br />RE: Recommendation for Sear Coal to reconfigure the permit <br />boundary, obtain a release of liability and extend the <br />operations duration <br />DATE: December 16, 1994 <br />At their regular meeting on December 16, 1994, Mark Schumacher <br />moved, Les White seconded, and the Planning Commission unanamiously <br />approved the following recommendation. <br />PROJECT DESCRIPTION: <br />The Bear Coal Company applied to reactivate the permit <br />boundary to the south and east of its Bear No. 3 mine, which will <br />increase the life of the mine. This action will extend the mining <br />operation five years beyond its present permitted life, which means <br />the mine will operate for approximately seven more years. Bear <br />mine proposes to reduce the subsidence monitoring performed at Bear <br />No. 3, as well as obtain a release of liability for some of the <br />permit area associated with Bear No. 1 and 2. The Colorado <br />Division of Minerals and Geology (CDMG) indicated that Bear Coal <br />has applied (phone conversation on 12-8-94 between Gunnison County <br />Planner Steven Westbay and Tony Waldron (CDMG)) to reduce the <br />permitted mining area and obtain a liability release associated <br />• with this action and expand operations into coal seam B in an area <br />where coal seam C was previously mined. Tony Waldron (CDMG) noted <br />that the action should not impact surface water, and mining will <br />occur in an area where "renewable resources" will not be impacted. <br />Waldron noted this seam B mining area may underlie an ancient <br />landslide. If the State determines that mass movement may be a <br />potential problem they will require monitoring to determine if <br />slope movement is reactivated. This permit by Bear Coal will not <br />change the present operations in terms of number of employees, <br />surface operations, additional facilities, or additional traffic. <br />A technical revision of the Bear permit proposes to <br />discontinue subsidence monitoring in two different circumstances. <br />Bear Coal proposes to stop monitoring in areas where no mining <br />activity has occurred within the past two years. They also propose <br />to cease subsidence monitoring in areas not considered to have <br />renewable resources. The CDMG definition of "renewable resource <br />lands" is as follows: "Renewable resource lands means aquifers and <br />areas for the recharge of aquifers, areas for agricultural or <br />silvicultural production of food and fiber, and pasturelands." <br />Under the Colorado State Mined Coal Lands regulations, Bear Coal is <br />not responsible for monitoring subsidence in areas that are not <br />considered "Renewable resource lands." Bear Coal will continue <br />monitoring in those areas with existing slope stability monitoring. <br />• Bear Coal is reactivating mining within the NE1/4, Section 20 <br />1 <br />