Laserfiche WebLink
3. The mine is presently in Phase I of the Division of Minerals <br />and Geology's reclamation process. <br />4. Continue to monitor the site for erosion until the vegetative <br />cover becomes fuL1y established. <br />5. The location of the sites is as follows: <br />Discharge Point #002, 37 08.43' Latitude & 104 54.E'8' Longitude <br />Discharge Point #002A, 37 08.39' Latitude & 104 54.63' longitude <br />Discharge Point #002B, 37 08.48' latitude & 104 54.56' Longitude <br />Discharge Point #003, 37 08.84' latitude & 104 54.38' longitude <br />Discharge Point #004, 37 08.65' Latitude & 104 53.59' longitude <br />Discharge Point #005, 37 08.82' latitude & 104 54.40' longitude <br />Discharge Point #045, 37 08.71' latitude & 104 54.33' Longitude <br />21. Person(s) Interviewed: Thompson, Ronald <br />Title: Property Manager <br />22. CDH Engineer/Tech:Knope, David ~~" (719)545-4650 <br /> <br />