Laserfiche WebLink
KERB COAL COMPANY <br />KERB MZNE <br />Quarterly Sedimentation Pond Inspection Report <br />Pond F <br />Date .t„ty F~ tyv~ <br />OPERATIONAL STATUS <br />1. Water Level (Staff Gauge Reading - Water) $•y Ft. <br />2. Sediment Level (Staff Gauge Reading - Sediment) « y Ft. <br />3. Outflow (Depth of Water in Weir) c~ Ft. <br />4. Actual Water Level: <br />3.0 - 10 + Item 1 t g Ft. <br />5. Percent of Total Sediment Storage: <br />10 - Item 2 <br />100 - x 100 ' 7i <br />3.0 <br />6. Outflow (CFS): 2.49 x CItem 3z.s) 0 CFS <br />FEATURES PROBLEMS COMMENTS <br />EROSIONAL: <br />Rills ~ Gullies on Embanl~ent YES NO <br />x <br />- <br />Inadequate Vegetation ~ <br />Outlet Channel Eroaioa x <br />Burrows x <br />Other x <br />STRUCTURAL: <br />Differential Settling YES NO <br />x <br />Cracks or Slides x <br />Seepage % <br />Other % <br />APPURTENANT STRUCTURES: <br />Defective §pillwags YES NO <br />x <br />Dewatering Device Clogged x <br />Faulty Weir Inatallatioa x <br />Other x <br />ADDITIONAL COMMENTS <br />MAINTENANCE REQUIRID: <br />NAME OF INSPECTOR : ~~i a~iz~ya./.c./ <br />