My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64663
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:35 PM
Creation date
11/20/2007 8:30:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000118
IBM Index Class Name
Permit File
Doc Date
10/30/2000
Doc Name
PINO PIT FN M-2000-118 REVIEW OF APPLICANT RESPONSE TO DIVISIONS ADEQUANCY REVIEW
From
DMG
To
BARNHART AGENCY INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />8 arnhart Agency, Inc. <br />N ~ 212 West 13th Street <br />Pueblo, CO 81003 • Fax (719) 543-1329 • Ph: (719) 543-1324 <br />October 27, 2000 ~~f ;~~vE~ <br />James C. Stevens Gf;T ~ 7 2000 <br />Colorado Dept. Of Minerals and Geology <br />1313 Sherman Street, Room 215 or.~s~uu ut Minerals and Geology <br />Denver, Colorado 80203 <br />~` <br />.0 <br />Re: Technical Adequacy Review of Reclamation Application Permit #M-2000-118 Pino Pit <br />Dear Mr. Stevens, <br />This letter is in response [o your letter dated September 29, 2000, regarding technical <br />clarifications [o our Pino Pit 1 l2 Permit Application. This response will address each item from <br />your letter in order. Also included is a response to your letter of October 3, 2000, regazding the <br />pre-operational inspection. <br />NOTICES: Please find enclosed proof of notifying Ed Pino and Ernest Shater, laid <br />owners, of this Permit Application. Also, is a copy of the final published public notice in the <br />Huerfano World newspaper. We will forward the affidavit of publication as soon as we get it. <br />EXHIBIT C: Rule 6.4.3- The "Permit Boundary Traverse" on all maps has been <br />corrected. [t now corresponds to Exhibit A. <br />EXHIBIT C: Rule 6.4.3(a) -The ownership "Key" has been changed to correctly <br />represent the property owners. <br />EXHIBIT C: Rule 6.4.3(8) -The owners of the permanent mamnade structures have been <br />added to the map. Alsu, a power line that runs parallel to the access road has been added. Please <br />see revised Exhibit C maps which are enclosed. <br />EXHIBIT D: Rule 6.4.4(e) -The applicant agrees that there will be no more than l0 acres <br />of open pit and no more than 1000 lineal fee[ of vertical, unreduced highwall existing at any <br />time. Overburden and topsoil will be stripped prior to excavating the gravel deposit. The <br />overburden will be stockpiled along two margins of the area to be excavated and the topsoil on <br />the third. The remaining pit margin will be ramped down into the pit. One mining has reached <br />the 10 acre limit, mining will be down to a 3H:1 V slope to avoid reducing the highwall by <br />backtilling. <br /> <br />"Your Brand of People" <br />
The URL can be used to link to this page
Your browser does not support the video tag.