Laserfiche WebLink
- 18 - <br />vrater level may remain stable temporarily so that both the drain-~ <br />~:ge system and the retaining wall might be installed at the <br />same time. <br />5. Attention should be paid to careful surface drainage so <br />that the existing conditions of surface drainage are not de- <br />teriorated by the proposed construction. <br />6. 4ie expect that not all details of the drainage systems ~ <br />and construction procedures can be worked out during the design; <br />they will have to be decided during the construction phase. ~ <br />3.4 OTHER STRUCTURES <br />There are several other structures and facilities proposed ~ <br />that are located within the landslide area. They include the <br />substation with a short road connecting it with the access road; <br />a shop and warehouse with the adjoining temporary offices and <br />parking lot; in the future, a waste rock conveyor is proposed. <br />A large refuse pile will be located immediately above the land- <br />slide area. The access road would be extended to the refuse pile . <br />i <br />level. <br />Located outside the landslide area, but close to its toe, <br />is a runoff pond(M3 ~ 1) and the fresh water pond (FW ~ 1). <br />Geotechnical conditions and design considerations for these <br />structures and facilities were discussed at several meetings <br />with Pferrick ~ Company representatives. A summary of our re- <br />commendations for these structures is presented in the follow- <br />ing paragraphs: <br />i <br />The substation is located in the lower and flatter part of <br />the landslide areas stabilitq conditions o£ old landslides are <br />u.o.naoca.mn.+n..c <br />