Laserfiche WebLink
•% RECEIVED <br />~ 2003 <br />E®19EC~i ~~~ 3 ~ <br />Coal Company <br />Division of Mineca <br />Colorado Department of Health <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, CO 80246-1530 <br />yo~ t <br />Seneca Coil C®m <br />July 24, 2003 <br />~ ~~~ <br />RE: Quarterly Discharge Monitoring Report for Permit CO-0000221 <br />Dear Sir or Madam: <br />Pursuant to the quarterly reporting requirements contained in <br />Colorado Discharge Permit CO-0000221 for the Seneca Mine Complex, <br />enclosed find the second quarter 2003 discharge monitoring <br />reports for Sites 002 to 006 and 008 to 017. In this quarter, no <br />discharges occurred at Points 009 and 014. Point 013 .has not been <br />constructed yet. Construction of Pond 014 was completed in <br />September 2001, no discharge has occurred yet. Construction of <br />Pond 017 was completed in November 2002. Due to a. lack of a safe <br />access road and deep winter snow, this site was not visited until <br />May. A better access road will be built to this pond this summer. <br />Vehicle access to Points 004, 008, 009, O15 and 016 was closed in <br />mid-November due to snow. Monthly visits in April were performed <br />by snowmobile or snowshoe. <br />No excursions of effluent limits occurred this quarter. Please <br />contact me at 970-276-5209 if you have any questions. Please note <br />that this is a new phone number for my direct line. Please change <br />your records to reflect this change. Our main switchboard number <br />remains the same, 970-276-3707. <br />Sincerely, <br />Dennis Jones <br />Hydrologist I <br />~c: Division of Minerals and Geology <br />Attn. Mike Boulay <br />1313 Sherman Street, Room 215 <br />Denver. CO 80203-2273 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />