Laserfiche WebLink
KERR COAL COMPANY <br />RERR MINE <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Pond C <br />Date 6-23-99 <br />1. water Level (above or below dewatering orifice) Above_ Below X <br />2. Sediment Level [below dewatering orifice (designed sediment level)] <br />3. Sediment Removal Required Yes <br />9. Outflow (depth of flow in weir) <br />5. Outflow <br />9.5 Ft <br />9.5 Ft <br />No <br />0 Ft <br />0 CFS <br /> PROBLEM <br />FEATURES <br />YES <br />NO C02~NTS <br />EROSION: <br />Rills s Gullies on Embankments <br />X <br />Wave Erosion X <br />Spillway Erosion X <br />Burrows X <br />Others X <br /> <br />STRUCTURAL: <br />Differential Settling <br />X <br />Cracks or Slides X <br />Seepage X <br />Other X <br /> <br />ST R.UCTURES: <br />Principal Spillway <br />Clogged Orifice <br /> <br />X <br />Clogged or Damaged Culvert X <br />Weir X <br />Emergency Spillway <br />Erosion <br />X <br />Riprap X <br /> <br />MAINTENANCE REQUIRED: None. <br />MAINTENANCE PERFORMED: None. <br />ADDITIONAL COMMENTS: Pond oversize due to previous sediment removal. <br />NAME OF INSPECTOR ~( <br />~pv~,,..... <br />\~~.~`` Pip R E <br />~~ ~~ <br />= U ~ <br />~ F- <br />~'lCr: <br />