My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27758
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:09 PM
Creation date
11/20/2007 8:25:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990106
IBM Index Class Name
Hydrology
Doc Date
8/29/2006
Doc Name
Substitute Water Supply Plan
From
OSE
To
Deere & Ault Consultants Inc.
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jason M. Brothers <br />August 17, 2006 <br />Page 3 <br />address, and phone number of the contact person who is responsible for <br />operation and accounting of this plan must be provided on the accounting forms. <br />The approval of this substitute water supply does not relieve the applicant and/or <br />landowner of the requirement to obtain a Water Court decree approving a <br />permanent plan for augmentation or mitigation to ensure the permanent <br />replacement of all depletions, including long-term evaporation losses after the <br />gravel mining operations have ceased. Application for a decree should be made <br />three years prior to the completion of mining with the intent of obtaining a <br />decreed plan by the completion of mining. <br />8. This substitute water supply plan may be revoked or modified at any time should <br />it be determined that injury to other water rights has or will occur as a result of <br />this plan. <br />9. The decision of the State Engineer shall have no precedential or <br />evidentiary force, shall not create any presumptions, shift the burden of <br />proof, or serve as a defense in any water court case or any other legal <br />action that may be initiated concerning the substitute water supply plan. <br />This decision shall not bind the State Engineer to act in a similar manner in <br />any other applications involving other plans or in any proposed renewal of <br />this plan, and shall not imply concurrence with any findings of fact or <br />conclusions of law contained herein, or with the engineering methodologies <br />used by the Applicant. <br />10. Acceptance of these conditions shall be assumed unless a letter to the <br />contrary is received by this office, tfie Division Engineer (310 E. Abriendo, <br />Suite B, Pueblo, CO 81.004), and the Water Commissioner (John Van <br />Oort, P.O. Box 148, Rye, Colorado 81069) within two weeks of your receipt <br />of this letter. <br />Please contact Don West of this office or Kalsoum Abbasi, Augmentation <br />Coordinator, in Pueblo at (719) 542-3368, if you have any questions concerning <br />this approval. <br />C~ <br />ick Wolfe, P.E. <br />Assistant State Engineer <br />Attachment: Table I <br />cc: Steve Witte, Division Engineer <br />John Van Oort, Water Commissioner, District 14 <br />Division of Reclamation, Mining and Safety <br />DW/DDW: Baxter Road Pit 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.