Laserfiche WebLink
<br />withdrawn as parties. Gilpin County announced through its representative that it was <br />withdrawing as a party because it had reached a stipulated agreement with the Applicant <br />conceming unresolved issues. That agreement is set forth in a pleading entitled "Soint <br />Stipulation of Applicant and County of Gilpin conceming County Permitting <br />Requirements." The contents of the Joint Stipulation were not incorporated into the <br />Board's order. Prior to the Formal Board Hearing, the parties met to attempt to resolve <br />other issues identified in the Board's prehearing conference order. As a result of that <br />informal meeting, the Division drafted conditions or stipulations conceming groundwater <br />monitoring, groundwater impacts and blasting. Because all parties did not agree to the <br />proposed conditions, the conditions were not adopted by the Board at the time it <br />considered the draft prehearing conference order. The conditions are set forth in greater <br />detail helow. <br />The issues set forth in the prehearing order, as revised, are: <br />(A) Has the Applicant provided Pre-Mining & Mining P-an Maps that accurately <br />show the location of the quarry entrance and all permanent man-made structures <br />within Z00 feet of the quarry entrauce (affected iand)? (Rule 6.d.3 (b} -Exhibit <br />C.) <br />(B) Has the Applicant provided an appropriate blast vibration analysis and blasting <br />plan demonstrating that off-site azeas will not be adversely affected by blasting? <br />At issue are potential damages to: the Black Hawk/Central City Sanitation <br />District's Waste Water Treatment Plant, sewage lines to the Clear Creek <br />Convenience Store (owned by Clear Creek Convenience LLC), Silver Dollaz <br />MMRR Boazd Order, M-2004-067 <br />2673 <br />