Laserfiche WebLink
L III I <br />/(~". VOLUME 3 INDE% IIIIIIIIIIII III _ <br />~-- <br /> NUMBER NAME Doc Date:1211112001 <br /> +2.03.4(5)-1 Surface Owners <br /> +2.03.4(5)-2 Mineral Rights <br /> 2.05.3(9)-2 Croee Sections of Proposed Uttderyround pevelopment Waste <br /> Site <br /> *2.04.3(2)(a)-1 Land Use Hap <br /> *2.04.3(2)(a)-2 Affected Land Map <br /> +2.04.3(3)-1 Previously Affected Land Map <br /> +2.04.5-1 Geology Hap <br /> +2.04.5-2 Bedrock Configuration Map <br /> +2.04.5-3 Zeopach Map - Alluvial Aquifer <br /> 2.04.5-3a Electric Loq - "E" Coal Seam Hap <br /> 2.Od.5-3b Electric Log - "D" Coal Seam Map <br /> +2.04.5-4 Geologic Cross Section Map <br /> +2.04.5-5 Geologic Crosa Section Hap <br /> •2.04.6-1 ieopach Map - "E" Coal Seam <br /> +2.04.6-1a Ieopach Map - "D" Coal Seam <br /> +2.04.6-2 Geologic Structure Map <br /> *2.04.7(2)(a)(b)-1 Surface Drainage Pattern Map <br /> 2.04.9-1 Soil Map <br /> 2.04.10-1 Vegetation Map <br /> +2.04.11-1 Deer Winter Range Map <br /> 2.05.2(2)-1 Red Canyon #1 and #2 Mines, Long Term Projections Map <br /> 2.05.3(1)-1 Red Canyon #1 Hine ('E" Seam) Hap, also showing Mine <br /> Permit Area <br /> 2.05.3(1)-2 Red Canyon #1 Mine Projections -'E" Coal Seam Map <br /> 2.05.3(1)-3 Red Canyon #1 Mine Projections -'D" Coal Seam Hap <br /> 2.05.3(2)(b)-1 Proposed Surface Disturbance Hap <br /> +2.05.3(4)-1 Drainage System Hap Deleted 6-16-88 <br /> 2.05.3(4)-2 Existing Drainage System Hap <br /> 2.05.3(4)-2(a) Post Reclamation Drainage System Hap Revised 6-7-93 <br /> 2.05.3(4)-2(b) Sediment Pond Plan View Nev 6-7-93 <br /> 2.05.3(4)-2(c) Sediment Pond Sections New 09-20-93 <br /> 2.05.3(4)-3 Small Area Exemption Map Revised 6-08-92 <br /> 2.05.3(7)-1 Delta-Loadout Facility Hap (Deleted) <br /> +2.05.4(2j(c)-1 Final Contour Hap Revised 7-11-88 <br /> *2.05.4(2)(C)-2 Pinal Contour Hap With Soil Sample <br /> b Cross Section Locations New 7-24-89 <br /> 2.05.4(2)(C)-3 Major Drainage Channel Profile New 7-24-89 <br /> 2.05.4(2)(C)-4 Cross Section B-B New 7-24-89 <br /> 2.05.4(2)(C)-5 Crosa Section C-C New 7-24-89 <br /> 2.05.6(3)-1 Hydrologic Monitoring Locations Map <br /> 2.05.6(6)(f)(ii)(C)-1 Subsidence Control Map <br /> *2.06.8(b)(i)-1 Surface Drainage Pattern Hap <br /> * These Hape do not show the actual permit boundary, refer to Map <br /> 2.05.3(1)-1 for the official permit boundary. <br /> <br /> Revised 09-20-93 <br />