Laserfiche WebLink
<br />s-s <br />' equipment for preparation oC the mine water prior to injection into the groundwater end <br />' obtaining a permit for Underground Injection (UI). <br />' The advantages oC this management alternative category include on-site management under <br />PCC'e control, limited regulatory requirements if evaporative measures are utilized, and <br />' potentially lees stringent UI permit conditions regarding TDS concentrations and loadings if <br />UI methods are utilized. Major disadvantages ofon-site management without direct discharge <br />' include obtaining a UI permit (if UI methods are utilized), evaporative impoundment size, <br />weather conditions conducive to natural evaporation, and utility requirements if assisted <br />evaporative methods are utilized. <br />1 <br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br /> <br />1 <br />