Laserfiche WebLink
4-12 <br />affected. This assumes that the ability to obtain the UI permit is practical. If opposition were <br />to occur, the ability to obtain a permit could be hindered. <br />' 4.4.6.4 Coate <br />The budgetary coats to implement this alternative for the complete removal of TDS (all mine <br />' water discharge to groundwater) are estimated to be $3,600,000 for the two current discharges <br />and $7,000,000 Cor all three discharges. These costa are based on injection of 140 gallons per <br />minute for the two discharges and 290 gallons per minute for all three discharges. The <br />budgetary costa to implement this alternative for partial removal of TDS (partial injection) in <br />order to achieve compliance with the 2,000 pounds per day and 350 tone per year salinity <br />' limitations are estimated to be $1,300,000 Cor the two current discharges and $3,600,000 for <br />all three discharges. These costa are based on injection of approximately 110 gallons per <br />minute for the two current discharges and 35 gallons per minute for all three discharges. <br /> <br />1 <br />1 <br />1 <br />t <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />