Laserfiche WebLink
<br />RECLAMATION PLAN <br /> <br />The aerial photo attached as Exhibit "C-1" and the map <br />attached as Exhibit "C" show the basic outline of the <br />location of the ponds in present extraction areas, as more <br />fully described above. The boundaries of areas utilized as <br />ponds, will, of course, closely follow the boundaries of <br />the excavation areas with the remaining area and bank to be <br />basically grasslands, as described above. The exact dimensions <br />and locations of the areas ultimately to be used as ponds in <br />the future extraction area are presently unknown, but will <br />closely approximate the dimensions and rate of slope of pond <br />banks in the extraction areas already shown on Exhibits "C" <br />and "C-1". These rates of slope will vary but will be <br />between 2-1/2 - 1 and 5 - 1. Each pond bank will include <br />some more gradual slope sufficient to allow wildlife access <br />to the pond. Where possible and appropriate, small islands <br />may be placed in some ponds to make them more usable as <br />wildlife habitat. As described above, the reclamation <br />process and the proposed final land use for areas in the <br />future extraction area, i.e., areas noted on Exhibit "C" as <br />Areas 7-11, will be the same as in Areas 1 through 6. <br />EXHIBIT "F" <br />