Laserfiche WebLink
<br />.~., <br />._ .... <br />BASIC RECLAMATION COSTS BROKEN DOWN AS FOLLOWS: <br />(Based on determination that approximately 20 acres of <br />post-mining surface of the affected acreage may consist <br />of land above water level where reclamation work may be <br />required.) <br />A. BACKFILLING: <br />I. Total estimated cost of $200.00 per acre <br />for labor and use of presently owned <br />equipment $ 4,000.00 <br />II. Equipment to be used: <br />Bulldozer, loader and trucks <br />B. LEVELING AND GRADING: <br />I. Total estimated cost of $200.00 per <br />acre for labor and use of presently <br />owned equipment $ 4,000.00 <br />II. Equipment to be used: <br />Bulldozer and loader <br />C. TOPSOILING: <br />I. Total estimated cost of $100.00 per <br />acre for labor and use of presently <br />owned equipment $ 2,000.00 <br />II. Equipment to be used: <br />Bulldozer, loader and trucks <br />D. RESEEDING: <br />I. Total estimated cost of $40.00 per <br />acre for labor and presently owned <br />equipment $ 800.00 <br />II. Cost of seed $50 per acre ~~; $ 1,000.00 <br />III. Equipment to be used: <br />Grain drill and seed spreader <br />E. MAINTENANCE <br />Includes cost of labor, tools and <br />fertilizer where necessary, estimated <br />at $40.00 per acre for one year $ 800.00 <br />TOTAL COST OF RECLAMATION <br />$ 12,600.00 <br /> <br />EXHIBIT "L" <br />