Laserfiche WebLink
<br />CONSTRUCTION SPECIFICATIONS <br />SECTION 100 <br />General <br />This work consists of furnishing personnel, materials, and equipment as <br />necessary for the construction of an earthen embankment for the "Refuse <br />Area Sedimentation Pond" for Snowmass Coal Company at their North Thomson <br />Creek Mines. All work shall be in accordance with the drawings and these <br />technical specifications. Any part of the work not clearly defined by <br />this specification or the drawings shall be governed by the best prevail- <br />ing practice in the area. Any conflict between this specification and <br />its supporting documents shall be resolved by Ponderosa Engineering, Inc. <br /> <br />