Laserfiche WebLink
Exhibit 19 Bonding Requirement for Apad~e Canyon Airshafts <br />Apache North Airshaft <br />This facility is a pre-law structure. 'I'hc shaft has been scaled in accordance with the <br />approved reclamation plan, the area contoured, ripped, and the seeded with the approved <br />seed mix and mulch. Less than one acre oC actual disturbance required revegetalion. <br />Remaining reclamation expenses have been projected to be $3,040 liar numilvring <br />vegetative success, erosion control and reseeding. 'I'bis area has been reclassified as an <br />Industrial Use post-mining land use area. Implementation of this land use will yualiCy the <br />area for full bond release. <br />Apache South Airshaft <br />The shaft has been scaled in accordance with the approved reclamation plan, the <br />disturbed at'ea contoured, ripped, and topsoil stripped from the area during construction <br />of the facility respread over the disturbed area. "fhe area was then seeded with the <br />approved seed mix and mulch. Less than one acre of achial disturbance required <br />. revegetation. Remaining reclamation expenses have been projected to be $5,040 Cor <br />monitoring vegetative success, erosion control and reseeding. "hhis area has been <br />reclassified as an Industrial Use post-mining laud use area. Implementation of this land <br />use will qualify the area for Cull bond release. <br />I• <br />TR-56 13xhibit 19-7 (Revised R/5/04) <br />