<br />TABLE 28 BONDING TRANSFER for Coal Exploration bonded under Permit Revisions
<br /> Approved Transfer to "Unused" Transfer Applicable
<br />Permit Revision Bond Amount Industrial Use Reduce Bond NOI
<br /> (TR-45) Bond Amount to an NOI
<br />TR-26 - (NM21,25,27,28 also bonded in CX-92-213-02) $ 29,100.00
<br />SF-3; SF-4; SF-5; SF-6; SF-7 (NOT CONSTRUCTED) $ 13,227.00
<br />SF-1 (33-94); SF-2 (32-94) $ 5,291.00 CX-93-213-0
<br />NM-21 (11-94) ;NM-25 (19-94); NM-27 (15-94); NM-28 (16-94) $ 10,582.00 $ 0.00 CX-92-213-0
<br />TR-29 $ 15,555.00
<br />GE-2-93; GE-4-93; GE-5-93 (NOT CONSTRUCTED)
<br />GE-1 (74-94); GE-3 (73-94); GE-6 (72-94) $ 15,555.00
<br />TR-36 $ 82,230.00
<br />GE-80; GE-85; GE-86; GE-87; GE-88; GE-89; GE-90; GE-91 $ 31,326.00 CX-91-175-2
<br />GE-81, 82, 83, 84, GE-92, 93, 94, 95, 96, 97, 98, 99, 100 (not constructed) $ 50,904.00
<br />MR-5 $ 7,291.00 0.00
<br />E-1, E-2 $ 7,291.00
<br />MR-6 $ 7,291.00 0.00
<br />E-1a $ 7,291.00
<br />MR-9 $ 3,462.00
<br />V-1 $ 3,462.00
<br />MR-10 $ 10,124.00
<br />GE-41,42 $ 2,531.00 CX-91-175-2
<br />GE-36, 37, 38, 39 $ 5,062.00 CX-92-213-D
<br />GE-40, GE-44,45 $ 2,531.00
<br />MR-11 $ 855.00
<br />Grounding Hole (SD-2 or Power Drop) $ 428.00
<br />Cased Service Borehole (SD-3) (Not Constructed) $ 427.00
<br />MR-15 $ 7,081.00
<br />GE90-2 (Not Constructed) $ 4,154.00
<br />GE90-3 (Emulsion drop or SD-1 in TR-45) $ 2,927.00
<br />MR-21 $ 40,571.00
<br />GE-1(59-91);GE-2(54-91);GE-3(56-91);GE-6(57-91);GE-9(55-91);GE-11( 56-91) $ 22,131.00 CX-91-175-2
<br />GE-4, 5, GE-7, 8, GE-10 (Not Constructed) $ 18,440.00
<br />MR-22 $ 43,494.00
<br />1991 Exploration - 22 Coreholes (Not Constructed) $ 43,494.00
<br />(Revision 11/26/97 TR-47)
<br />Ex. 19-5
<br />
|