Laserfiche WebLink
<br />EXHIBIT 19 <br />SCHEDULE MR-27 <br />(Bonding Requirements MR-27) <br />r1 <br />U <br />'~ J <br />A. Tank Removal (Skid Mounted Surface) <br />Transport to Certified Salvage Dump $500 <br />B. Concrete <br />160 S.F. x 6" reinforced wire mesh <br />@ $4.01 per S.F. 640 <br />156 S.F. x 4" reinforced wire mesh <br />walls @ $2.40 per S.F. 450 <br />TOTAL $1,590 <br />Basis: Means Facilities Cost Data 1992 <br />2-31-1992 <br /> <br />