My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64330
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:17 PM
Creation date
11/20/2007 8:22:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tipple Rule 2.01 PERMITS GENERAL REQUIREMENTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (a) Proposed revisions and modifications of said permit must be <br />submitted within twelve months of the approval by the Secretary of the <br />Colorado regulatory program. <br />(b) Revisions or modifications of said permit are made to <br />reflect substantive differences between the Colorado regulatory program and <br />the Federal regulatory program; and <br />(c) All requirements of the Act and 2.07, pertaining to public <br />participation and notification, are complied with. <br />RESPONSE: <br />The Fish Creek Tipple/loudout and the associated haulroad are not <br />located on Federal Lands. Therefore, Rule 2.01.3(5) is not applicable <br />to this permit application. <br />• (6) No permit shall be required for reclamation operations on <br />abandoned or unreclaimed lands not required to be reclaimed under state or <br />Federal law. <br />RESPONSE: <br />The Twentymile Coal Company does not intend to conduct reclamation <br />operations on abandoned or unreclaimed lands which are not required to <br />be reclaimed under State or federal law. <br />Rule 2.01.4 - Permit Requirements for New Surface Coal Mining and <br />Reclamation Operations <br />Each person who expects to conduct new surface coal mining and <br />reclamation operations within the eight month period following approval of <br />the Colorado regulatory program shall file a complete application for a <br />permit in accordance with applicable provisions of Rules 2 and 4. <br />• <br />2.01-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.