My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64330
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:17 PM
Creation date
11/20/2007 8:22:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tipple Rule 2.01 PERMITS GENERAL REQUIREMENTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ULE 2 - PERMITS <br />2.01 - General Requirements <br />Rule 2.01.1 - Scope <br />This section establishes the minimum general requirements for permits <br />required to commence or continue surface coal mining and reclamation operations. <br />The objectives of this section are to insure that all persons make timely <br />application for permits, and that all surface coal mining and reclamation <br />operations are conducted only under permits issued in accordance with the <br />requirements of the Act and these Rules. <br />RESPONSE: <br />No response is necessary; Twentymile Coal Company will comply with the <br />scope of this section. <br />Rule 2.01.2 - General Requirements for €xisting Operations <br />Not later than two months following the date of approval of the Colorado <br />regulatory program by the Secretary, all operators who are conducting and intend <br />to conduct surface coal mining operations eight months after such approval, <br />shall file an application for a permit with the division for such operations. <br />The application shall comply with all applicable provisions of Rules 2 and_4. <br />With regard to the requirements of 2.05.6(3)(b)(iv), the application shall be <br />considered filed if it contains all applicable hydrologic information reasonably <br />available to the aoolicant as of the date of the apolication. <br />RESPONSE: <br />Twentymile Coal Company (TCC) is hereby submitting a complete permit <br />application, as that term is defined in Rule 1.04(30). This permit <br />application is being filed in accordance with Rule 2.01.2 and is designed <br />to comply with the applicable provisions of Rules 2 and 4. <br />• <br />2.01-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.