Laserfiche WebLink
ULE 2 - PERMITS <br />2.01 - General Requirements <br />Rule 2.01.1 - Scope <br />This section establishes the minimum general requirements for permits <br />required to commence or continue surface coal mining and reclamation operations. <br />The objectives of this section are to insure that all persons make timely <br />application for permits, and that all surface coal mining and reclamation <br />operations are conducted only under permits issued in accordance with the <br />requirements of the Act and these Rules. <br />RESPONSE: <br />No response is necessary; Twentymile Coal Company will comply with the <br />scope of this section. <br />Rule 2.01.2 - General Requirements for €xisting Operations <br />Not later than two months following the date of approval of the Colorado <br />regulatory program by the Secretary, all operators who are conducting and intend <br />to conduct surface coal mining operations eight months after such approval, <br />shall file an application for a permit with the division for such operations. <br />The application shall comply with all applicable provisions of Rules 2 and_4. <br />With regard to the requirements of 2.05.6(3)(b)(iv), the application shall be <br />considered filed if it contains all applicable hydrologic information reasonably <br />available to the aoolicant as of the date of the apolication. <br />RESPONSE: <br />Twentymile Coal Company (TCC) is hereby submitting a complete permit <br />application, as that term is defined in Rule 1.04(30). This permit <br />application is being filed in accordance with Rule 2.01.2 and is designed <br />to comply with the applicable provisions of Rules 2 and 4. <br />• <br />2.01-1 <br />