Laserfiche WebLink
Ef3U1PMEP!!T SPEC:PIC ~ :O NS <br />C <br />C <br />1 <br />SECTION II <br />SECONDARY TREAT`!ENT SYSTE.`f ?'~E ? <br /> <br />X 20.2 Complete easy-to-Follow instructions shall be furnished so as to obtai:t <br />accurate results by inexperienced personnel. <br />20.3 All necessary laboratory equipment (bottles, graduated cylinders, Imho1.`f <br />settling flask, etc.) shall be Furnished. Renewable standard sol•~tion:; <br />are provided in easy-to-use, distinctly marked containers. <br />20.4 The Portable Laboratory shall be capable of making the Eo11o•.rin~. tests. <br />dissolved oxygen, settleable solids, pH and chlorine residual tests. <br />Kith these simple tests, all the data needed to maintain Draper operaton <br />of any extended aeration or contact stabilization process sewag_ creac~- <br />ment system can be obtained. <br />21. FIELD ASSE`BLY <br />21.1 In almost every case, shipment of your prefabricated treatment ~1ar.t i:; <br />done by special lowboy trucks. When your plant is shipped by ou; t:uc{:, <br />delivery will be made directly to the jobsite. The equipment necessar•~ <br />to unload the plant and set it on the foundation pad must be fur-ist:ed <br />by the customer. A crane of adequate size is usually the simplest mett;od <br />for unloading the plant. Lifting lugs are supplied on the vessel to ease <br />handling. '• <br />21.2 When the plant arrives at the jobsite, the owner's contractor should have <br />available the necessary equipment to unload and set the vessel on the <br />foundation pad. A crane of adequate size is the easiest and fastest <br />method. Lifting loons are provided on the vessel to simplify handling, <br />After setting the plant in position, a check should be made to see that: <br />it is level, and in the correct position. <br />21.3 Our package steel treatment systems shall be completely assembled unit;; <br />and are shipped as a unit where shipping height limitations pe r..it this; <br />procedure. If a portion of the equipment.must be removed to ~eec shipping <br />height limitations, this equip men[ will be packaged separa[e1:• at the <br />factory Eor Field assembly. This equipment and tankage should be field <br />assembled and installed by the owner's contractor in the field. <br />22. FIELD SERVICE <br />22.1 At the time the wastewater treatment system is Filled with water or <br />sewage, and all power connections have been completed, and all eeuipment <br />is approved for service, the contractor shall provide the services of :. <br />representative of the manufacturer who shall instruct the owner's <br />representative in the proper operation and maintenance of the •.:asta•.:ater <br />treatment system, ic;luding instructions in conducting aLl reoui;_~ <br />operational tests. e manufacturer's representative sh.~11 fur-[5n at <br />D'~DAO-DF,9DHICS <br />