Laserfiche WebLink
I Sectior, 78C.23 (b;~ Continued. <br />I~ <br />I (5 Surface ership (Map 3)) oth than Energy Fuels;:,are set <br />~. <br />forth n Exhibit 1, Letter rom James apovlas i^o Energy~Fuels <br />stating cceptance o postmini land use~~~dated S\ep~ember ~, 1979. <br />I <br />Section 780.2`_ Reclamation plan: Ponds, impoundments, banks, <br />I dams and embankments. <br />(a) General. <br />Each application shall include a general plan for each proposed sedimen- <br />tation pond, water impoundment, and. coal processing. waste bank, dam, or <br />embankment r:ithin the proposed mine plan area. <br />(1) Each general plan shall- <br />(i) Be prepared by, or under the direction of, and certified by a <br />qualified registered professional engineer, or by a professional geologist <br />with assistance from experts in related fields such as land surveying <br />~ and landscape architecture; <br />i <br />(ii) Contain a description, map, and cross section of the structure and <br />its location; <br />(iii) Contain preliminary hydrologic and geologic information required <br />to assess the hydrologic impact of the structure; <br />(iv) Contain a survey describing the potential effect on the structure <br />from subsidence of the subsurface strata resulting from past underground <br />mining operations if underground mining has occurred; and <br />(v) Contain a certification statement which includes a schedule setting <br />forth the dates that any detailed design plans for structures that are <br />not submitted with the general plan will be submitted to the regulatory <br />780-208 <br />Permit Renewal No. 3 Exhibit 8q 1/]5/00 <br />Page 22 of 22 <br />