My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2001-12-11_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 9:17:47 AM
Creation date
11/20/2007 8:19:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 08q Pond T Certification
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-11- <br />I For Pond A, flow will be conveyed dowr. the haul road embankment from the <br />60-inch RCF emergency spillwa}-. It ui11 be conveyed down the embankment in <br />' a riprap lined channel which is shown in cross-section on LRCIdE Figure 4, <br />Sedimentation Pont A, Emergency Spillway Channel. An adequate energy dis- <br />sipator should be installed at the toe of the slope. <br />I <br />REQllIRED SEDIAfENTATION VOLUMES <br />I 30CFR816.46 (b) provides two methods for computing required sedimentation <br />I volume_=. The first i_= the product of 0.1 acre-feet per acre and the total <br />number of disturbed acres during the mining and reclamation activities. For <br />I the 10 pond sites, this method was used to determine an approximation of the <br />sedimentation veiume. For those sites which required greater than 20 feet <br />or greater Chan 20 acre-feet to contain the sum of the required sedimentation <br />I volume and the 10-year inflow flood, the required sedimentation volume was <br />computed using the alternate technique. The alternate technique utilizes the <br />Universal Soil Loss Equation (USLE), gully erosion rates, and sediment del- <br />ivery ratios. The total of eroded material which would accumulate from three <br />years of average erosion was converted to a sediment volume using appropriate <br />sediment densit~~ data. Tae form of the USLE used in this analysis <br />is A = R(K) (LS) (VM), which is the more applicable form of the equation for <br />surface coal mining and reclamation activities. It is described in an art- <br />icle titled "Rigliway Erosion Control Systems- an Evaluation Based on the Uni- <br />versal Soil Loss Equation" which was published in Soil Erosion: Prediction <br />and Control, published and copywrited in 1976 by the Soil Conservation Society <br />of America. The VD1 factor accounts for the effects of all erosion control <br />measures which may be applied to an}' given site, including planting vegetation, <br />~ physical changes, and application of chemicals. The factors R, K, and LS are <br />defined in Technical Release Number 51, published by the Soil Conservation <br />Service in 1977. Erosion control measures which will be undertaken as part <br />of the mining and reclamation plans are more fully described in Section <br />780.21 of the application. The most critical year from the point of view of <br />generation of sediment was determined for each site. For this analysis, a \'M <br />factor ranging from i.0 for all disturbed areas with no ground cover, to a <br />• value of 0.05 for all areas permanently seeded after 12 months was used. The <br />Permit Renewal No. 3 Exhibit 8q 1/15/00 <br />Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.