Laserfiche WebLink
There are no users of surface waters or persons who have water rights in, or adjacent to, <br />the permit azea other than the present landowner. The potential impact to the neazest <br />ground water wells has akeady been addressed in Section 2.04. OEI will pursue obtaining <br />the necessary priority numbers for the water it develops during the course of mining <br />activities. Adjudication can occur after beneficial use actually occurs. <br />The quantity of water, both surface and underground, will be protected from adverse <br />effects of the mining operation. All surface water originating in and above the drainage <br />azea will be allowed to flow to the Animas River as it always has. The Animas River is <br />not over appropriated. <br />Water Monitoring <br />Surface and groundwater will be monitored in the following manner: <br />Surface Water <br />Parameter/Location Spring 1 Spring 3 Spring 4 <br />(C.J. Canvoa Unl (REA SPG #3) (CJ-LO-SPG #41 <br />flow semi-annual semi-annual semi-annual <br />tem erature semi-annual semi-annual semi-annual <br />H semi-annual semi-annual semi-annual <br />EC semi-annual semi-annual semi-annual <br />full suite chemist semi-annual semi-annual semi-annual <br />Sediment pond discharges aze monitored and sampled in accordance with the requirements <br />of CPDS permit COG 850027. <br />Ground Water <br />Parameter/Location We1117-13 Well 94-1 We1195-1 <br />(uu¢radientl (mid-mine) (down~adient) <br />depth to water semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />temperature semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />pH semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />EC semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />full suite chemistry semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />TR08, TRll (v 1.0) 5-55 Revised 9/97, 8/02 <br />