My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64182
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:10 PM
Creation date
11/20/2007 8:18:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
10/9/2002
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the above described modifications to the reclamation plan pertaining to the <br />North Pit, the haul road to the North Pit, the Permanently Reclaimed Spoils Area, Topsoil <br />Stockpile #2, and Carbon Junction Canyon, the following modification was made <br />previously to the reclamation plan. This change involved removal of the former explosives <br />area from the mine site. <br />Golf Course Reclamation <br />The northwest comer of the original permit azea (approximately 10 acres} fell within the <br />area planned for development of a golf course and ancillary facilities. To facilitate <br />construction of the golf course facility, Oakridge Energy requested that the explosives <br />bench and access road be left in their current configuration. Based on this request, liability <br />release from CDMG was sought for this area. CDMG approved this release in 1997. <br />Subsequent to the liability release, the area was excised from the Carbon Junction Mine <br />permit area (CDMG TR07). <br />Timetable and Schedule <br />Reclamation of the Cazbon Junction Mine is slated to begin in the autumn of 2002 and <br />continue through completion. The completion of the tasks identified and described above <br />is anticipated to take three construction seasons (through the summer of 2005). With <br />completion of the earthmoving and retopsoiling, seeding and planting is contemplated in <br />the autumn of 2005. Should this timetable need to be altered, OEI will apprise CDMG <br />and revise the permit. <br />Reclamation Costs <br />Reclamation costs for third party completion of the reclamation plan have been developed <br />and are presented for reclamation of the North Pit, the haul road to the North Pit, topsoil <br />stockpile # 2, the permanently reclaimed spoils area, and reconstruction of Carbon <br />Junction Canyon. The following tables present the reclamation costs for these tasks. <br />TRO8, TRl l (v1.0) 5-40 Revised 9/97, 08/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.