Laserfiche WebLink
Reconstruction of Cazbon Junction Canyon <br />The restoration of the Carbon Junction drainage will be part of the final reclamation plan and is bonded for the <br />cost of the work. The work involves a diversion of 1962 feet that will be riprap lined and will have one culvert <br />crossing under the main access road. The channel itself will be 14' wide after lining and varies in depth from <br />1.9 feet to 2.8 feet for segment 6, including freeboard. <br />TR08, TRI1 (v1.0) 5-38 Revised 9/97, 08/02 <br />