My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64182
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:10 PM
Creation date
11/20/2007 8:18:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
10/9/2002
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One ephemeral seep has been located southeast of the Permanently Reclaimed Spoils Area <br />and northwest of the South Pit, adjacent to the pit access road. Inspection of the seep in <br />October 1997 revealed that the seep issues from a sandstone layer below the level of the <br />South Pit and above the level of the Permanently Reclaimed Spoils Area. Flow from this <br />seep enters the road drainage ditch and renters the ground approximately 250 feet below <br />the seep. Native hydrophytic vegetation has grown azound the seep and ditch and <br />mitigates any acidic content of the seep prior to reentry into the ground. <br />EzP[osives and Blasting <br />Currently there aze no explosives used or stored on-site. At such time as mining resumes <br />and the need for blasting products is determined, OEI will revise and update the blasting <br />information. <br />Ammonium nitrate prill and dynamite were used during mining. Explosive quantities to be <br />used have been provided in Appendix 5-5. <br />The blasting plan provides for the retention of blasting records (logs) showing: <br />Drilling patterns, column size, number ofholes, spacing ofholes, and depths (based on <br />professional studies by Mr. Don Howell conducted for the Carbon Junction Mine). <br />Charges and packing ofholes will be specified. Initially, primacord will be used as the <br />detonator (fuse) with case primers and/or dynamite until the inuring azea is enlarged. <br />Thereafter, electric detonation devices will be used with the appropriate tuning <br />sequences and detonation controls. <br />At all times, the sequence and timing of firing holes will be controlled and a delay <br />pattern sketch will be made with each blasting incident. <br />Blasting warning signals and access control have been addressed in the blasting plan <br />(Appendix 5-5). <br />No blast monitoring equipment is necessary as the neazest buildings aze in excess of 1,000 <br />feet away. The neazest public building (structure) is in excess of 3,000 feet distant. OEI <br />will restrict the maximum weight of explosives to be detonated in any 8 millisecond period <br />to 2,500 pounds. <br />If pre-blasting surveys are required, they will be conducted in accordance with current <br />CDMG regulations. <br />TR08, TRll (v1.0) 5-26 Revised 9/97, 08/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.