Laserfiche WebLink
SECTION 2.05 OPERATION AND RECLAMATION PLAN <br />2.05.1 Objectives <br />Oakridge's objective for Section 2.05 is to submit a comprehensive, reliable plan of operations and a <br />reclamation plan consistent with available environmental resources information and in compliance <br />with the provisions of this Section. Information responsive to the Operations and Reclamation Plan <br />requirement have been set forth in the following pages. <br />2.05.2 Operation Plan -Estimated Area for the Life of the Operations <br />At this time no further coal mining will occur at the Carbon Junction Mine. <br />The original box cut spoil from the North Pit and South Pit was placed in the permanently reclaimed <br />spoil area. Stability of this area was investigated and confirmed during the initial permitting of the <br />mine and construction of the box cut spoil azea. This azea has an engineered underdrain and was <br />constructed in Lifts to ensure long-term stability. <br />2.05.2[11 Production Methods and Equipment <br />No further coal mining will occur at the Cazbon Junction Mine under this permit. Remaining <br />activities will be limited to those necessary to reclaim the mine and monitor reclamation. <br />TR09, TRll (v1.0) 5-1 Revised 3/98, 8/02 <br />