Laserfiche WebLink
BASIN RESOURCES, INC. <br />' SEDIMENTATION POND INSPECTION FORK <br />POnd GOLDEN EACLE NPDE$ NO, 004 <br />1 Date of Inapection~f~__9__,_/Sff _ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: xcelle Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, Llon <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yea No~_ <br />At the principal spillway inlet? Yes No~_ <br />4. Erosion of the downstream toe of the embankment? Yes No o~_ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yee _ Nom If yea <br />could this seepage cause potential instability? Yee No~_ <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yes~No <br />2. is the inlet free of debris and restrictive material?Yea a~_No <br />3. Ia the discharge outlet tree of restrictive mate:rinl? Yea~No_ <br />4. Is erosion occurring at the discharge outlet? Yes No_J~If <br />yes, <br />evaluate the severity: Extensive Nodernt• Just starting None <br />.~ <br />EMERGENCY SPILLMAY <br />1. Is the overall emergency apillwny system capable of passing <br />design storm discharge? Yea~_No <br />t 2. Does it appear as if the emergency'spillwey has discharged water <br />since the last inspection? Yee Nom <br />3. is erosion occurring at any section of the emergency spillway? <br />Yea Nom, Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the desi~ggn storage capacity of the reservoir been surpassed? <br />Yes No X i! yes, ._. <br />exnla'- ' <br />t ;;:,;. Please ndd any special comments concerning potentially dangerous <br />problems on the beck of this ^heet. <br />I n s p e c t o r_~i~~„~,.~. <br />