Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond GOLDEN EAGLE SAE 11 6 11A NPDES NO. CONTAINMENT DITCH <br />Date of Inspection }III/S5~ <br />EMBANKMENT <br />- 1. Adequacy of the vegetative cover: Excellent Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, hone <br />3. Is wave action causing erosion: <br />On the upstream embanlopent? Yea No~_ <br />At the principal spillway inlet? Yee No~_ <br />4. Erosion of the downstream toe of the embankments! Yes Nom <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yee _ No pC If yes <br />could this seepage cause potential inatability7 Yea Nom <br />Explain: <br />PRINCIPAL SPILLMAY /~/ nv/ <br />1. Ia the principal spillway system in working order? Yea Mo <br />2. Ia the inlet free of debris and restrictive material?Yes No <br />3. is the dischnrge outlet free of restrictive material? Yes No_ <br />4. Is erosion occurring at tha discharge outlet? Yes No If <br />yes, <br />evaluate the severity: Extensive l[oderete Just starting None <br />~~ <br />EMERGENCY SPILLMAY /1/o~/j ' <br />1. is the overall emergency spillway system capable of pansinq <br />design storm discharge? Yes No <br />2. Does it appear as if the emergency'spillway has discharged water <br />since the lnat inspection? Yea No <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yes No Describe tha <br />extent <br />SEDIMENT STORAGE CAPACITY ~O'~ t <br />1. Has the design storage capacity of the reservoir' been surpassed? <br />Yea No If yes, <br />P Y n ~ = ^ ' <br />l „4. Please add any special comments concerning potentiell.y dangerous <br />problems on the beck of thin ^heet. <br />Inspector_,(a ~ <br />