Laserfiche WebLink
13-2 3 Sediment Control Calculations <br />. 13-3 3 Alternate Drainage <br /> 13-4 4 Geotechnical Investigations: Cameo 8 Roadside Mines Refuse Pile <br /> 13-5 4 Coal Waste Stability Study Cameo Refuse Piles 2 & 3 and Rocky Mountain <br /> Geotechnical Figures 4 & 5 <br /> 13-6 4 Geotechnical Investigation: Pond 12 <br /> 13-7 4 Public Service of Colorado -Drainage South of Haul Road 5 <br /> 14-1 5 BLM-Proposal for Revegetation Research Project <br /> 14-2 5 Reclamation Pfan Cost Estimate <br /> 14-3 5 Reclamation Costs, Cameo Refuse Disposal Areas Nos. 2 and 3, and other <br /> Areas <br /> 14~ 5 Other Reclamation Cost Estimates <br /> 14-5 5 Affected Land Owners Reclamation Approval <br /> 14-6 5 Final Reclamation Drainage Design <br /> 16-1 5 Air Pollution Permits <br /> 17-1 5 Material Safety Data Sheets <br /> 17-2 5 Salinity Report <br />• 18-1 5 BLM Consent for Monitoring on Jerry Creek and Coal Canyon , <br /> 20-1 6 Protective Pillar Design for Ute Water Property <br /> 20-2 6 Angle of Draw Observations <br /> 20-3 6 Pillar Design Analysis <br /> 20-4 6 Subsidence Prediction <br /> 20-5 6 Colorado Ute Transmission Line Subsidence Predictions <br /> 20-6 6 Colorado Ute Notice to Proceed with Transmission Line Construction <br /> 20-7 6 Public Service of Colorado Transmission Line Reservations <br /> 20.8 6 Consequences of Subsidence on Powerlines <br /> 21-1 6 Colorado Division of Mines Production Records January thru July 1977 <br /> 21-2 6 Assessment of Alluvial Valley Floor Issues Unit Train Loadout Site <br /> 21-3 6 Reconnaissance Level Alluvial Valley Floor Investigation of the Rapid & <br /> Cottonwood Creek Area <br /> 21-4 6 Reconnaissance Level Alluvial Valley Floor Investigation -Powderhorn Mine & <br /> Adjacent Area <br /> 21-5 6 Stream Flow Water Yield for Irrigation <br /> 21-6 6 First Amended and Restated Agreement Between General Exploration <br /> Company & Mississippi Power Company <br /> vii (Rev. 7/16197) <br />