Laserfiche WebLink
Amended Table No. 3 <br />Applegate <br />Group, y,.~. <br />Camenish Borrow Pit Substitute Water Supply Plan, M-06-078 <br />Water Balance & Replacement Requirements <br /> <br />Month Total <br />Depletions <br />(Evap & <br />Operational) <br />(acre-ft) <br />A Total <br />Lagged <br />Mining <br />Depletions <br />(acre-feet) <br />B Lease <br />Replacements <br /> <br /> <br />(acre-feet) <br />C <br />Feb-07 Z.70 0.00 0.00 <br />Mar-07 2.74 0.00 0.00 <br />A r-07 2.99 0.00 0.00 <br />Ma -07 3.19 0.00 0.00 <br />Jun-07 3.31 0.00 0.00 <br />]u1-07 3.34 0.00 0.00 <br />Au -07 3.29 0.00 0.00 <br />Se -07 3.13 0.01 0.01 <br />Od-07 2.99 0.02 0.02 <br />Nov-07 2.85 0.03 0.03 <br />Dec-07 0.12 0.04 0.04 <br />]an-OS 0.06 0.06 0.06 <br />Tota 30.7 0.2 0.2 <br />Feb-08 0.03 0.08 0.08 <br />Mar-08 0,07 0.10 0.10 <br />A r-08 0,31 O.1Z 0.12 <br />Ma -08 O.SZ 0.14 0.14 <br />Jun-08 0.63 0.17 0.17 <br />Jul-OS 0.66 0.19 0.19 <br />Au -08 0.62 0.21 0.21 <br />Se 08 0.45 0.22 0.22 <br />Oct-08 0.32 0.24 0.24 <br />Nov-OS 0.17 0.26 0.26 <br />Dec-08 0.12 0.27 0.27 <br />Jan-09 0.05 0.28 0.28 <br />Total 4.0 2.3 2.3 <br />(A) Total evaporational depletions and total operational mining depletions. See Table No. 1 (Evaporation) and Table <br />No. 2 (Operational). <br />(B) Total lagged mining depletions which reflect steady state conditions at the Camenish Borrow Mining Site. <br />(C) Timing of winter replacements. Replacements for first year will be provided by Saint Vrain Left Hand Water <br />Conservancy District. Flatiron requests approval of this plan through January 31, 2008 with a condition that a new <br />lease for 6.5 acre-feet from February 2008 through January 2009 be submitted to the SEO prior to January 31, 2008. <br />Prapare0 By: MLA <br />CiDacumente antl SettmgaymwLLOCa15emnpelTemporary mtamet FileetOLK1DICamreniah Borrow 20075WSP CU - Upaatetl2 28 0].xla L28/1o0] <br />