Mir1'teile L. Austin <br />November 25, 2005 <br />Depletions <br />Paget <br />The total annual losses resulting from evaporation, water lost in product, dust control and <br />conuete belching are shown in the following table: <br />TABLE B • LOSSE8 <br />Site Name Evaporation <br />Losses <br />ao-ft Lost in <br />Product <br />ao-o-ft Dust <br />Control <br />ao-ft Concrete <br />t3atching <br />aoft Total <br />(ao-ft) <br />Howe Pit 0 19.87 4 72.8 38.67 <br />Tanabe Pit 29.3 0 0 0 29.3 <br />Dunes Develo ment 9.04 58.9 2 0 69.89 <br />Mann Lakes 71.13 8.82 2.97 0 80.72 <br />Ft Lu ton PR 11.8 0 0 0 11.8 <br />Rlverbend O reflon 0 0 0 0 0 <br />S S Pro 12.9 14.T 2 0 29.6 <br />A slurry welt wiB be installed around the Stagecoach Stop Property so that the site will be <br />sealed from the tributary groundwater. During the first two months of the mining operation the <br />plt wiN be dewatered and the water will be used to construct the shirty wall. Approximately 81 <br />acre-feet of water will be pumped and used in the slurry wall construceon in the first two months, <br />or approximately 30.5 acre-feet per month during Ocbber 2005 and November 2005. <br />Ali process water for the Stagecoach Stop Property wiU be pumped from a new proposed <br />wall located Inside the miNng pennft boundary but outside of the slung wall. The water from the <br />well witl be pumped ink a smaA lined wash pond Inside the slurry wail Tined pit You have <br />assumed that the process water is 100% consumed. <br />A monthly breakdown of the lagged mining depletions are shown in the attached Table 1. <br />Replacements <br />The proposes sources of replacement water are 25 shares of Pullet Ditch and tufty <br />consumable water leased from the City of Greeley, Consolidated Mutual Water Company and <br />Saint Vrein Left Hand Water Conservancy District. The Fulton Ditch water will be recharged into <br />Zigan Reservoir which Is a reclaimed gravel pit located in Section 35, Township 1 South, Range <br />87 West, 6°' P.M. <br />The plan will also account for the impacts and credits from the dewatering at the <br />Stagecoach pit. The plan es8mates that dewatering will occur for 8 hours per day, 385 days per <br />year at a rate of 1,000 gpm. See attached Appendix C for the esttmated credit and depletons <br />from dewatering. <br />The historic use of the 25 Fulton ditch shares yields 43.89 acre-feet of water during April <br />through October while generating 5.25 acre-feet of return fkmr obligation during November <br />through March. This quantiftption is based on the technique used in the March 24, 1999 <br />approval for the Fulton Lakes Pit, where the historic wnsumpltve use values were determined <br />using an anaysis decreed in case number 82CW393. In this approach, headgate diversions <br />were based on average rnonthy values for the period of 197&1988 and a 10% conveyance loss <br />was assumed as wetl as a farm efficiency of 50%. The return flow obligations, which were not <br />addressed in the above decree, were calwlated for this plan based on the, assumption that all ~` <br />