Laserfiche WebLink
'D'Field parameters annually (May/Julyl. Water samples, collected annually, analyzed using <br />the long list (Table 7-104) it flows exceed 3 gpm. <br />'E'Field parameters and total dissolved solids analyses are performed monthly (winter <br />monitoring exemption may applyl. Triannual (spring runoff, post-runoff, and baseflow) <br />water samples are analyzed using the long list (Table 7-104). Additional monitoring <br />requirements also exist for NPDES sites. Refer to NPDES permit (Appendix 7-5). <br /> <br />TR-45 7-350 Revised 04/07 <br />